Latent Conditions in Residential Building: New Build vs Renovation
When it comes to latent conditions in residential building, there are some key differences between new builds and renovations. Here are some points to consider:
- Difference between new builds and renovations: A new build is a construction project that involves building a completely new residential property from scratch, while a renovation involves modifying and upgrading an existing property.
Common latent conditions in new builds:
- Poor soil quality: This can lead to issues such as unstable foundations, uneven settling, and water penetration.
- Unexpected geotechnical issues: These can include soil instability, subsidence, and groundwater problems that can cause structural damage to the building.
- Poor workmanship: This can include issues such as substandard construction materials, incorrect installation of structural components, and inadequate design.
Common latent conditions in renovations:
- Asbestos: This is a common latent condition in older homes, especially those built before the 1980s. Asbestos can be found in various building materials such as walls, ceilings, floors, and roofs.
- Hidden structural issues: Renovations can often reveal hidden structural issues such as termite damage, rotting wood, and cracks in walls and foundations.
- Electrical and plumbing issues: When renovating, it’s not uncommon to discover hidden electrical or plumbing problems that require expensive repairs.
By understanding the types of latent conditions that can arise during a new build or renovation, homeowners can better prepare themselves for the potential costs and challenges associated with these issues.
The Variation Claim: Understanding Terminology and Costs
When a latent condition is discovered during a residential building project, the builder may submit a variation claim to the homeowner. Here are some key points to understand about variation claims related to latent conditions:
Terminology used in variation claims:
- Latent condition: This refers to a defect or issue that is not apparent or visible before the construction process begins.
- Variation: This is a change to the original scope of work agreed upon in the building contract.
- Variation claim: This is a request by the builder for additional payment to cover the costs associated with the variation.
Cost breakdown in the variation claim:
- Additional costs associated with removing the latent condition: This can include the cost of additional labour, materials, and equipment needed to remove the latent condition.
- Cost of rectification work: This includes any additional work needed to repair or replace materials or structures affected by the latent condition.
- Cost of delay: This includes any additional time and costs incurred as a result of the latent condition delaying the project timeline.
- Profit margin: This is the builder’s fee for managing the variation and associated costs.
It’s important for homeowners to carefully review the cost breakdown in the variation claim to ensure that they understand the scope of work involved in removing the latent condition and the associated costs. Homeowners may want to seek professional advice to ensure that they are not being overcharged for the variation.
Legal Rights and Options for Homeowners
When homeowners receive a variation claim for latent conditions, they have legal rights and options to consider. Here are some key points to keep in mind:
Legal rights:
- The homeowner has the right to request evidence from the builder to support the variation claim.
- The homeowner has the right to negotiate the cost of the variation claim with the builder.
- If the builder is in breach of contract, the homeowner may have the right to terminate the contract and seek damages.
Options for dealing with a variation claim:
- Negotiation: Homeowners and builders may be able to negotiate a settlement that works for both parties. This can save time and money compared to other dispute resolution processes.
- Mediation: A neutral third party can facilitate a mediation process where both parties can work towards a resolution. This can be a cost-effective and efficient option.
- Litigation: If negotiation and mediation are unsuccessful, homeowners may choose to take legal action against the builder. This can be a lengthy and expensive process.
Benefits and drawbacks of each option:
- Negotiation: This option can be cost-effective and efficient. However, homeowners may feel pressure to accept a settlement that is not in their best interests.
- Mediation: This option can be a cost-effective way to resolve disputes. However, the outcome is not legally binding, and there is no guarantee of success.
- Litigation: This option can provide a legally binding resolution. However, it can be expensive and time-consuming, and there is no guarantee of success.
It’s important for homeowners to carefully consider their legal rights and options when faced with a variation claim for latent conditions. Seeking professional advice can help homeowners make informed decisions and ensure that their legal rights are protected.
Seeking Professional Advice and Assistance
Dealing with a variation claim for latent conditions can be a complex and stressful process for homeowners. Seeking professional advice and assistance is essential to ensure that their legal rights are protected and to navigate the dispute resolution process successfully. Here are some key points to keep in mind when seeking professional help:
- Construction lawyers can provide expert advice and guidance on legal issues related to building contracts, latent conditions, and dispute resolution processes.
- A construction lawyer can help homeowners negotiate with the builder and potentially avoid the need for litigation. They can also represent homeowners in court if necessary.
- When choosing a construction lawyer, homeowners should consider their experience, reputation, and communication skills. It is important to choose a lawyer who specialises in construction law and has experience dealing with variation claims for latent conditions.
- Homeowners should also consider the cost of hiring a construction lawyer and ensure that their fees are reasonable and transparent.
In summary, seeking professional advice and assistance from a construction lawyer can help homeowners navigate the dispute resolution process more effectively and ensure that their legal rights are protected.

Conclusion
In conclusion, latent conditions can be a complex and challenging issue for homeowners who are building their dream home or undertaking a renovation. It is crucial to understand the legal terminology and costs associated with variation claims related to latent conditions. Homeowners have legal rights and options to consider when dealing with a variation claim, and seeking professional advice from a construction lawyer is highly recommended.
As a construction lawyer with over 10 years of experience, I have advised numerous homeowners and builders regarding latent conditions and their legal rights. My experience has taught me that seeking professional advice can help homeowners navigate the dispute resolution process and achieve a favourable outcome.
If you have received a variation claim for latent conditions in your building project, it is essential to act quickly and seek professional advice. I encourage you to speak with a construction lawyer who can provide guidance and assistance tailored to your specific circumstances.
Remember, building your dream home should be an exciting and enjoyable experience, and a construction lawyer can help ensure that your rights are protected.